Skip to content
Saturday, 21 November 2026
Anine News
Breaking
India

Nitish Setu: PM Modi to Open Six-Lane Ganga Bridge in Bihar

The Kachchi Dargah-Bidupur bridge has been named after former CM Nitish Kumar, drawing mixed political reactions.

N
By News Desk
Patna · Published: · Updated:
हिंदी में पढ़ें

PM Modi is scheduled to dedicate the six-lane cable-stayed bridge over the Ganga linking Patna and Vaishali on 21 November 2026. Here are the key facts, and what the naming row is about.

Nitish Setu: PM Modi to Open Six-Lane Ganga Bridge in Bihar
Nitish Setu: PM Modi to Open Six-Lane Ganga Bridge in Bihar Photo: Anine News
Share

Quick answer: Prime Minister Narendra Modi is set to dedicate the new six-lane, extradosed cable-stayed bridge over the Ganga between Kachchi Dargah (Patna) and Bidupur (Vaishali) on Saturday, 21 November 2026. The Bihar government has named it "Nitish Setu" after former chief minister Nitish Kumar, a decision that has drawn mixed political reactions.

BridgeKachchi Dargah-Raghopur-Bidupur bridge, now named Nitish Setu
RiverGanga, linking Patna and Vaishali districts
TypeSix-lane, extradosed cable-stayed
Main bridgeAbout 9.76 km (project including approaches reported at roughly 19.7-19.76 km)
CostReports differ: about Rs 4,280 crore to about Rs 5,000 crore
EventProgramme in Vaishali district, 21 November 2026

What is Nitish Setu?

Nitish Setu is the new name of the Kachchi Dargah-Raghopur-Bidupur bridge, a six-lane crossing over the Ganga that connects the outskirts of Patna with Bidupur in Vaishali district through Raghopur. Media reports describe it as an extradosed cable-stayed structure, with a main river bridge of about 9.76 km and a wider connectivity project of nearly 20 km once approach roads are counted.

Reports say construction began in June 2017 and that the first phase, from Kachchi Dargah to Raghopur, was opened in June 2025. Larsen & Toubro and South Korea's Daewoo E&C are named among the builders, working for the Bihar State Road Development Corporation.

Why is the bridge important for Bihar?

The Ganga has long split north and south Bihar, and crossings around Patna are among the busiest in the state. The new bridge is meant to give traffic another link between Patna and the Vaishali side and to connect several national highways. Reports differ on exactly which highways it joins, so the precise connections are best confirmed with the road authorities.

Some reports say it will be India's longest river bridge, overtaking the 9.15-km Bhupen Hazarika Setu over the Lohit river in Assam. That claim comes from media coverage rather than an official statement seen by this newsroom.

Who named it and how have parties reacted?

Chief Minister Samrat Choudhary said on X that the state government had named the bridge "Nitish Setu". Nitish Kumar, the Janata Dal (United) chief, stepped down as chief minister in April 2026, when Choudhary of the BJP took over.

JD(U) working president Sanjay Kumar Jha welcomed the decision as recognition of Nitish Kumar's role in Bihar's development. An RJD leader, Bhai Arun Kumar, said naming structures after living leaders sets a wrong tradition and described the move as a political patch-up. Reports also say the Congress has questioned the naming. The opposition criticism is political comment, not established fact.

What will the Prime Minister do on 21 November?

According to the chief minister's post, Modi will dedicate the bridge and also lay foundation stones and inaugurate other development projects at a public programme at Rajapakar in Vaishali district. The full list of projects has not been detailed in the reports reviewed.

Frequently asked questions

When is Nitish Setu being inaugurated?

Prime Minister Modi is scheduled to dedicate it on Saturday, 21 November 2026, at an event in Vaishali district.

Where does the bridge run?

It crosses the Ganga from Kachchi Dargah near Patna to Bidupur in Vaishali district via Raghopur.

How long is it?

The main bridge is reported to be about 9.76 km. The overall project, with approach roads, is reported at roughly 19.7 to 19.76 km.

How much did it cost?

Reports give different figures, from about Rs 4,280 crore to about Rs 5,000 crore, so the official figure should be awaited.

Why is the name being debated?

The bridge is named after a former chief minister who is still an active political leader. JD(U) has welcomed this, while the RJD and, according to reports, the Congress have objected.

Was part of the bridge already open?

Yes. Reports say the Kachchi Dargah to Raghopur section opened in June 2025.

Details are drawn from statements by the Bihar chief minister and party leaders as reported by Indian media; figures such as cost and length vary between reports.

Share

Related Stories